length: 1220mm-3660mm;
thread: R, T;
fushing hole: 9mm-16mm;
Production starts in our electric arc furnace. Only carefully selected steel scrap is used as raw material. Before continiuous casting, the analysis is checked and adjusted in the ladle furnace. This, in combination with the selected raw material, makes it possible to maintain the chemical composition within tight limits and to control the content of impurities and non-metallic inclusions.